The machine was redesigned and built by Ed Blue of Ace in the Hole Metal Works, Inc.
|
The machine can be operated by one or two people.
|
A stack of pleated wire units,
each 36x36 inches |
Pleated wire units attached to the exterior surface of the membrane with hog-rings.
|
|
|
|
|
Rebars were laid to support a flat exterior membrane section.
|
Boards were used to support a sagging membrane.
|